Pacheco Reservoir Expansion Project

About This Project

A collaboration between Valley Water, the San Benito County Water District, and the Pacheco Pass Water District, the Pacheco Reservoir Expansion Project is a strategic and long-term investment toward ensuring a more reliable supply of safe, clean drinking water in the face of climate change.

The project will boost Pacheco Reservoir’s operational capacity from 5,500 acre-feet to up to 140,000 acre-feet, enough to supply up to 1.4 million residents with water for one year in an emergency. The project will also reduce the frequency and severity of water shortages during droughts, protect our drinking water supply and infrastructure, and improve fish habitat.

Proposed location of the Pacheco Reservoir Expansion
Datapoints
Phase
Design
Location
60 miles SE of San Jose (just north of Hwy 152)
Schedule
Start of construction 2027 / End of construction 2035 (estimates)
Cost
$2.78 billion (as of 3/16/23) - $504 million funded by CA Prop 1, and additional funding TBD
News and UpdatesNews and Updates
Reports and DocumentsReports and Documents
Environmental and Community BenefitsEnvironmental and Community Benefits
History and BackgroundHistory and Background
News & Updates

Valley Water will be preparing an environmental impact report for the proposed geotechnical investigations for the Pacheco Reservoir Expansion Project; a virtual scoping meeting was held on Oct. 17 

On June 17, 2024, Valley Water issued a Notice of Intent to adopt an Initial Study/Mitigated Negative Declaration (IS/MND) for the Design Level Geotechnical Investigations for the Pacheco Reservoir Expansion Project, in accordance with California Environmental Quality Act (CEQA) guidelines. The proposed geotechnical investigations would be conducted to help gather essential information about the soil and rock characteristics at the project site.

The public comment period on the IS/MND closed on July 19, 2024.

In consideration of comments received on the Draft IS/MND, Valley Water has decided to prepare an Environmental Impact Report (EIR) for the proposed Design Level Geotechnical Investigations for the Pacheco Reservoir Expansion Project. The EIR will re-evaluate the proposed Design Level Geotechnical Investigations and consider comments received on the IS/MND, as well as comments received through the scoping process for the EIR to determine if the project would result in any significant environmental effects.

The Notice of Preparation (NOP) of a Draft EIR was issued on Oct. 1, 2024, and is available for review at https://www.valleywater.org/public-review-documents. Valley Water is seeking input from public agencies, members of the public, and other interested parties on the scope of issues and content of the environmental information that should be included in the Draft EIR.

To provide comments, please e-mail [email protected] and include the subject line “DLGI Scoping Comments.” You can also send comments via regular mail to:

Santa Clara Valley Water District
Attn: Todd Sexauer, Senior Environmental Planner
5750 Almaden Expressway
San Jose, CA 95118

Comments must be submitted no later than Wednesday, October 30, 2024.

Valley Water is inviting all interested parties to a virtual public scoping meeting at 6 p.m. on Thursday, Oct. 17, 2024, to learn the latest news about the scope and content of the Project EIR that Valley Water will be preparing. We are also encouraging the public and agencies to provide any additional comments on the scope and content of the EIR.

The presentation and a recording of the meeting are available to view:

    - View the presentation here.
    - View the meeting recording here.

Staff provided project update to the Board of Directors on Oct. 8, 2024

Valley Water staff provided an informational update to the Board of Directors at its meeting on Oct. 8, 2024. The presentation focused on the Pacheco Reservoir Expansion Project's unique requirements and resulting unique benefits. 

Visit our website to review the agenda and project attachments https://scvwd.legistar.com/Calendar.aspx.

Pacheco Reservoir Expansion removed from Safe, Clean Water Program

On April 9, 2024, the Valley Water Board of Directors (Board) held a formal public hearing and approved not implementing Project A1: Pacheco Reservoir Expansion (Project A1) under the Safe, Clean Water Program, thereby removing the project from the program. The Board's decision was in response to funding gaps resulting from rising infrastructure project construction costs and growing community expectations impacting the progress of other projects.

Safe, Clean Water Project A1 was one of the three renewed Safe, Clean Water projects with a fiscal-based KPI. The deliverable was not to construct a project directly, but to allocate up to $10 million to help construct the Pacheco Reservoir Expansion Project (Pacheco Project). The $10 million allocation constituted less than half a percent of the Pacheco Project’s estimated total cost in FY24. The Safe, Clean Water funding was scheduled to be transferred to the Water Utility Fund over a period of seven years (from FY2026 to FY2032), amounting to approximately $1.4 million annually.

The Pacheco Project, which continues to be part of Valley Water’s Capital Improvement Program, is primarily funded by the Water Utility Fund and has continued to progress without any contributions from the renewed Safe, Clean Water Program. Given the project’s other funding sources and relatively minor contributions from the renewed Safe, Clean Water Program, the absence of a $10 million allocation is not expected to significantly impact the Pacheco Project advancement.

Valley Water released environmental document for proposed geotechnical investigations to inform proposed Pacheco Reservoir Expansion Project design and planning

On June 17, 2024, Valley Water issued a Notice of Intent to adopt a Mitigated Negative Declaration (IS/MND) for Design Level Geotechnical Investigations for the Pacheco Reservoir Expansion Project (proposed Project), in accordance with California Environmental Quality Act (CEQA) guidelines.

Valley Water would be conducting geotechnical investigations to help gather essential information about the soil and rock characteristics at the Pacheco Reservoir site in Santa Clara County. This information would be used to finalize design of the proposed Pacheco Reservoir Expansion Project, which could increase the storage capacity of the existing reservoir from 5,500 acre-feet to up to 140,000 acre-feet. The IS/MND, which is available for public review, evaluates the environmental impacts related to these proposed geotechnical investigations.

The public comment period on the IS/MND closed on July 19, 2024, at 5 p.m.

Staff provided project update to the Board of Directors on June 11, 2024

Valley Water staff provided an informational update on the cost and financing of the proposed Pacheco Reservoir Expansion Project to the Board of Directors at its meeting on June 11, 2024.

Visit our website to review the agenda and project attachments https://scvwd.legistar.com/Calendar.aspx .

Staff provided project update to the California Water Commission on April 17, 2024    

Valley Water staff provided a project update to the California Water Commission on April 17, 2024. To view the agenda and more information visit: https://cwc.ca.gov/Meetings/All-Meetings/2024/Meeting-of-the-California-Water-Commission-Apr-17-2024

Staff provided project update to the Board of Directors on Feb. 13, 2024   

Valley Water staff provided an informational update on the operations and benefits of the proposed Pacheco Reservoir Expansion Project to the Board of Directors at its meeting on Feb. 13, 2024.

Click here to watch a recording of the meeting and review the agenda and project attachments. 

Valley Water provided update to the California Water Commission    

On Oct. 18, 2023, Valley Water staff provided a project update to the California Water Commission. To view a recording of the meeting, visit https://cwc.ca.gov/Meetings/All-Meetings/2023/Meeting-of-the-California-Water-Commission-Oct-18-2023.

You can download the PowerPoint presentation here.

Staff provided Valley Water Board of Directors informational update on Pacheco Reservoir Expansion Project  

On Aug. 22, 2023, Valley Water staff provided the Board of Directors with an informational update on the proposed Pacheco Reservoir Expansion Project.

You can view the staff presentation here.

You can review the agenda item, attachments and watch a recording of the board meeting by visiting https://scvwd.legistar.com/Calendar.aspx

Valley Water Board of Directors receive update on proposed Pacheco Reservoir Expansion Project and Water Supply Master Plan at Special Meeting 

On March 16, 2023 at 11 a.m., the Valley Water Board of Directors held a special meeting and received an update from staff on Water Supply Strategy, Water Supply Master Plan, and a work-study session on the proposed Pacheco Reservoir Expansion Project.

You can view the staff presentation here

You can review the agenda, project attachments and watch a recording of the meeting at https://scvwd.legistar.com/Calendar.aspx

Public review period closed for Draft Environmental Impact Report on the Pacheco Reservoir Expansion Project

Valley Water appreciates the comments received. Valley Water will spend the next several months reviewing the written comments to incorporate into the Draft EIR.  

Virtual public information meeting held for Draft Environmental Impact Report on the Pacheco Reservoir Expansion Project

Valley Water held a public meeting on Jan. 13, 2022, presented the draft EIR and answered questions. The Valley Water Board of Directors will consider approval of the Pacheco Reservoir Expansion Project following the completion of the Final Environmental Impact Report.

If you missed the meeting on Jan. 13, 2022, you can watch the recording by clicking on the link below.  

Meeting recording

Meeting presentation slides

Valley Water releases Draft Environmental Impact Report on the Pacheco Reservoir Expansion Project

The draft Environmental Impact Report (EIR) was made available for public review beginning Nov. 17, 2021. The public comment period ended on Feb. 15, 2022.

To review the draft EIR, click here.

Valley Water's Pacheco Reservoir Expansion Project continues to remain eligible for state funding and will request federal assistance 

On Nov. 9, 2021, the Valley Water Board of Directors unanimously approved a funding commitment for the Pacheco Reservoir Expansion Project to remain eligible for up to $496 million in conditional funding from the state’s Prop 1 Water Storage Investment Program (WSIP).

On Dec. 15, 2021, the California Water Commission found the Pacheco Reservoir Expansion Project to be feasible and remain eligible or up to $496 million in conditional funding from WSIP.

On March 16, 2022, the California Water Commission increased the potential funding amounts for the seven projects in WSIP, increasing the total conditional funding for the Pacheco Reservoir Expansion Project to $504 million.

The WSIP funding represents a significant portion of the Pacheco project’s estimated $2.5 billion cost. Valley Water is exploring various dam alternatives that could reduce the cost to $2 billion.

We are actively looking at ways to bring down the costs to ratepayers. Beyond the $504 million in state money, we are looking at federal grants and the Biden administration’s infrastructure package. In April 2022, Valley Water applied for a Water Infrastructure Finance and Innovation Act (WIFIA) loan, a low-cost federal loan that is typically cheaper than what Valley Water can borrow on its own, bringing down the financing costs needed to fund the project.

Be Heard! 

To share your ideas and feedback about the Pacheco Reservoir Expansion Project, please visit our online engagement site Be Heard Valley Water. 

Click or tap to Be Heard!
Click or tap to Be Heard!

Virtual public scoping meetings and open house 

Valley Water issued a Notice of Preparation for an Environmental Impact Report (EIR) for the Pacheco Reservoir Expansion Project in 2017 and solicited public scoping comments at that time. In February 2021, Valley Water hosted two virtual public scoping meetings and shared the news about the scope and content of the Project EIR that Valley Water was preparing. If you missed the meetings, you can watch the recordings by clicking on the links below.

Thursday, Feb. 25, 2021 from 5:30-7:30 p.m.
Wednesday, Feb. 24, 2021, from 1-3 p.m.

Please click here to read the Notice of Virtual Public Scoping Meetings and Open House

If you would like to see the presentation prior to the scoping meetings, please see the pre-recorded video below:

Click here to view the PowerPoint presentation for the above recording

Notice of Preparation and Initial Study (2017)

Updates

Water is our most precious resource. Climate change, droughts, and population growth pose significant challenges for the reliability of our water supply. Preparing for future dry years by ensuring a reliable supply of safe, clean drinking water is vital for the region. The Pacheco Project will help us provide a more reliable supply for you and your family.

Join the growing list of supporters

Join our efforts to bring this project to fruition. There is much to like in the Pacheco Reservoir Expansion Project as it delivers on the promises that earned a “Yes” vote for Prop. 1 by nearly three of every four San Benito and Santa Clara county voters in 2014. 

Be a part of the 62 environmental, community, non-profit and businesses organizations, along with elected leaders, who have submitted letters supporting the project. Please join this wide-ranging group of supporters.

We are committed to keeping you informed with our progress and to provide opportunities for your input on this project. Please sign up for progress updates.

 

For more information:

Environmental & Community Benefits

Ensuring a more reliable supply of safe, clean drinking water

Safe and Clean Drinking Water – Emergency Water Supply – Improving Habitat for Fish – Flood Risk Reduction

A collaboration between Valley Water, the Pacheco Pass Water District and the San Benito County Water District, the Pacheco Reservoir Expansion Project is a strategic and long-term investment toward building a more reliable water supply in the face of climate change. The increased storage capacity at Pacheco Reservoir will nearly equal the capacity of Valley Water’s ten other reservoirs combined.

The project will also reduce the frequency and severity of water shortages during droughts, protect our drinking water supply and infrastructure, and improve habitat for fish. The Pacheco Project has also been named as the preliminary preferred option to address an issue of algae growth at San Luis Reservoir. Read more about the connection between the Pacheco Project and San Luis Reservoir here.

What does an expanded Pacheco Reservoir mean to us?

Thumbnail

In Santa Clara and San Benito counties, about 40% of our water supply currently comes from the Sacramento-San Joaquin Delta. In the event of an earthquake, Delta levee failure or other major catastrophe, we could lose that water for up to 18 months. The project will boost Pacheco Reservoir’s operational capacity from 5,500 acre-feet to up to 140,000 acre-feet, enough to supply up to 1.4 million residents for one year in an emergency.

Thumbnail

In Santa Clara County, nearly half of all our water is pumped from underground basins.

During droughts and emergencies, there is a greater reliance on these aquifers, but overpumping groundwater could result in subsidence (the sinking of earth’s surface), which causes permanent damage to roads, bridges and pipelines. Expanding Pacheco Reservoir would double the amount of water we can store above ground, making us less reliant on our groundwater supply during droughts, which would replenish the groundwater supply and protect overlying infrastructure.

Thumbnail

By expanding Pacheco Reservoir, managed water flows from the reservoir into Pacheco Creek would increase the quality of fish habitat downstream. The expanded reservoir would provide suitable flow and water temperatures to Pacheco Creek and improve approximately 10 miles of habitat to support the migration and survival of the South Central California Coast Steelhead.

Thumbnail

The expanded Pacheco Reservoir will incidentally reduce flood risk along Pacheco Creek and downstream Pajaro River by holding back peak flows, offering some relief to disadvantaged communities in Dunneville, Watsonville and Pajaro.

 

Geographic Area of Benefit:

Countywide

History & Background

About Pacheco Reservoir

Located on the lower end of North Fork Pacheco Creek, the expanded reservoir project includes the construction of an earthen dam made of rock and soil upstream of the existing dam, a pump station, a pipeline and other supporting items. The expanded reservoir would be filled by a combination of rainfall, runoff from the watershed upstream of the new dam, and imported water supplies.

Water released from the reservoir will help threatened fish by keeping the Pacheco Creek flowing, before seeping into the underlying groundwater aquifer as it winds toward where it meets the Pajaro River.

The aquifer fed by Pacheco Reservoir begins at its northern tip in Santa Clara County and extends south into San Benito County. Agricultural users served by the Pacheco Pass and San Benito County water districts pump water from this aquifer.

Funding the project

In 2017, Valley Water, Pacheco Pass Water District and the San Benito County Water District collaborated in securing $484.5 million of the $1 billion project cost to increase Pacheco Reservoir's storage capacity and deliver water supply, water quality and ecosystems benefits to the region and the Sacramento-San Joaquin Delta. Funding to expand Pacheco Reservoir, located 60 miles southeast of San Jose, was secured from California’s Water Quality, Supply and Infrastructure Improvement Act of 2014. The Act, passed by state voters as Proposition 1, provided $2.7 billion for investments in surface and groundwater storage projects, under the Act’s Water Storage Investment Program.

In early 2021, the Pacheco project was awarded about $12 million in additional funding from Prop 1, bringing the total to about $486.6 million. You can see all the projects that have received funding from Prop 1 at the California Water Commission website. 

Currently, Valley Water has entered into an early funding agreement for $24.2 million with the California Water Commission to share project planning and environmental studies costs. Valley Water is presently conducting studies, investigations and surveys to design and evaluate potential environmental impacts and feasibility. The draft environmental impact report is expected to be released by 2022.

In 2020, Valley Water performed a more detailed design study which included an updated cost estimate. This design study indicated that construction costs for the proposed project had increased to about $2.5 billion, prompted largely by major changes to the dam and spillway design.

In November 2020, Santa Clara County voters approved the Safe, Clean Water and Natural Flood Protection Program, which provides up to $10 Million to help construct the Pacheco Reservoir Expansion Project.

Staff is available to provide presentations to civic, neighborhood, and stakeholder groups. To request a presentation, please contact: Mark Gomez, [email protected], or (408) 630-2985. You may also review the project’s frequently asked questions to learn more about the benefits.

Updated: April 2024